COMMERCIAL SOUNDPROOFING

Stage 1:

Industrial factory area for office

Stage 2:

Area to be soundproofed

Stage 3:

Factory shop floor

Stage 4:

Installing the acoustic floor

Stage 5:

Build up of acoustic floor

Stage 6:

Forming the twin wall and viewing gallery

Stage 7:

Acoustic shield 10 (AS10) being installed

Stage 8:

Installing the outer twin wall system

Stage 9:

Walls being completed